A Groundwork company - serving Burbank, CA
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Altadena, CA

ADU Site Prep & Utilities in Altadena - One Fixed Price, Permits Handled

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Burbank
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Altadena, CA: What It Takes and What It Costs

ADU site prep and utilities in Altadena runs $45,000 – $130,000 depending on lot slope, trench distance to existing service and whether the site needs retaining or fire-hardening work. The underground and foundation phase usually takes 4 – 8 weeks before framing starts. Call (844) 797-7958 and we’ll walk your lot and give you a written, line-item number.

Call (844) 797-7958

How we run the underground phase, start to finish

A remodeled family room with new windows and a window seat

Site prep isn’t glamorous work, but it decides whether your ADU is a smooth build or a money pit. Here’s the real sequence we follow on Altadena lots, with the decisions landing on you at each stage.

Stage 1 – Site walk and setout (day 1). We mark the building envelope, verify setbacks against your survey, and identify what has to come out: old concrete, a shed, a struggling tree inside the footprint. You confirm the final ADU placement here, because moving it later means re-trenching. On sloping lots off Mendocino or Santa Rosa, this is also where we flag whether a standard truck can even reach the pad.

Stage 2 – Demolition and rough grading (days 2 – 5). We strip the footprint, haul spoils, and cut the pad to grade. On hillside lots this often means a first pass of retaining or shoring. You’ll want your geotech or civil report ready before this stage, not after.

Stage 3 – Foundation and trenching (days 5 – 15). Pier-and-beam or slab goes in, and we trench for sewer, water, gas and electrical runs back to the main house. This is the longest single stage and the one most affected by what we find underground: old clay sewer lines, unpermitted retaining walls, roots. You approve the utility routing and any meter upgrades here.

Stage 4 – Utility rough-in and inspection (days 15 – 30). Plumbing, electrical conduit, gas line and low-voltage go in and get inspected before backfill. You sign off on fixture and panel locations now, since changes after inspection mean re-work.

Stage 5 – Backfill, drainage and final grade (days 30 – 45). We backfill, install drainage and swales, and grade to shed water away from both structures. You get a walkthrough of what’s buried and where, in writing, so future work doesn’t hit a line.

That’s the underground phase only. Framing, finishes and the rest of the build follow, and you can see the full scope on our Home Additions & ADU in Altadena page.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices that actually shape your site prep

Half the budget decisions in this phase come down to a handful of material and system calls. Here’s what you’re choosing between, with honest trade-offs.

  • Foundation type: Slab-on-grade is cheaper and faster but unforgiving of Altadena’s slopes and clay soil. Pier-and-beam handles grade changes and lets you access plumbing later, at a higher upfront cost. On hillside lots, pier-and-beam is often the only sane choice.
  • Sewer approach: Tying into the existing line is cheapest if the main can handle the added load. A grinder pump or new lateral costs more but solves a lot where the fall won’t cooperate.
  • Electrical service: A subpanel fed from the main house is the common route. A separate meter is cleaner for renting the ADU but adds utility coordination and cost.
  • Drainage and retaining: French drains and engineered retaining walls are where cheap bids hide. Altadena’s winter downpours will find a bad wall fast.
  • Fire-hardening: Chapter 7A materials on the ADU envelope are not optional in the foothill zones. Ignoring them fails inspection.

Where we spec real brands, it’s because they hold up: Therma-Tru doors and Andersen or Marvin windows on the ADU envelope are common picks for fire-rated and energy performance. We’ll walk you through what fits your lot before you commit a dollar.

What ADU Site Prep & Utilities costs in Altadena, CA

A framer checking new wall framing on a home addition

Expect $45,000 – $130,000 for the site prep and utilities phase of an ADU in Altadena, with the wide spread driven mostly by slope, trench distance and what’s underground.

Line item Typical range
Grading, demo and spoils haul $4,000 – $15,000
Foundation (slab or pier-and-beam) $12,000 – $35,000
Sewer, water and gas trenching + rough-in $10,000 – $28,000
Electrical service and conduit $6,000 – $18,000
Retaining walls and drainage $8,000 – $30,000
Fire-hardening and inspection prep $3,000 – $12,000

What pushes a job to the high end: a steep lot needing major retaining, a long trench run to a far utility, an old main that needs upgrading, and unpermitted work we have to bring to code. What keeps it low: a flat pad, short utility runs and a clean existing service.

A written estimate from us itemizes each line above, so you see where the money goes. It does not include discretionary soil testing, geotech reports, utility company connection fees or structural engineering, and we say so upfront so nothing surprises you mid-build.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Altadena homes specifically do to this job

Altadena is not a tract-home market, and site prep here reflects that. Most housing dates from the 1920s – 1950s, a mix of Craftsman bungalows, Spanish Colonial Revivals and mid-century custom ranches, many on hillside lots that want pier-and-beam foundations and retaining walls. When we tie an ADU into one of these homes, we’re often matching clinker brick, clay tile and true divided-light windows rather than pulling standard stock.

The foothill location raises the stakes. Hot, dry summers and Santa Ana winds mean Chapter 7A wildfire code compliance on the ADU envelope and fire-resistant roofing and fencing. Intense winter downpours test every slope and can undermine an old unpermitted retaining wall, so we go in expecting to rebuild drainage, not patch it. Then there’s access: narrow, oak-lined lanes like those off Mendocino or Santa Rosa often can’t take a standard concrete truck or crane, so hillside jobs routinely need pump trucks or conveyor delivery, which adds days of labor invisible on a flat-lot bid. Every project is a one-off, and that reality shapes our schedule and our price. We cover all of Altadena, including the 91001 and 91003 ZIP codes.

Homeowners often pair the finished ADU with a new hardscape approach afterward, and we handle Concrete Driveways & Concrete Work in Altadena and Paver Driveways in Altadena as separate projects once the utilities are settled.

Serving Altadena, CA – Our Local Coverage Area

We serve Altadena and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – ADU Site Prep & Utilities in Altadena

A remodeled kitchen with a waterfall island and wood cabinets

Let’s look at your lot

A free on-site estimate for ADU Site Prep & Utilities in Altadena starts with us walking your lot, checking utility access and reviewing your plans against the real grade. You’ll get a written, line-item number with no change-order surprises, backed by our 730-Day Done Right Promise. Call (844) 797-7958 to book your estimate, and a real person answers any hour.

Written by the team at Groundwork Construction Co.

Why Altadena Chooses Groundwork Construction Co. of Burbank

We set the standard for ADU site prep & utilities in Altadena.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Altadena

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Altadena Customers Say

Trusted by homeowners across Altadena and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"Quality work and honest pricing. He is stretched across a few jobs at once so he is not always on site, though the carpenter who was there knew everything."

Whitney Norris

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new front yard fence with a matching gateA new paver pool deckAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelights

More services in Altadena

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Burbank

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Burbank team

A local vetted partner works across Burbank and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Altadena?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Altadena.

(844) 797-7958

Request a Free Estimate in Altadena

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch