A Groundwork company - serving Burbank, CA
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Alhambra, CA

ADU Site Prep & Utilities in Alhambra - One Fixed Price, Permits Handled

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Burbank
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Alhambra, CA: What the Ground Work Actually Costs

ADU site prep and utilities in Alhambra typically run $45,000 – $130,000 when you fold the groundwork into a full build, and the prep-and-utility slice alone (demo, grading, trenching, service upgrades, connections) usually lands between $28,000 and $55,000 depending on how far your panel, sewer lateral and lot lines are from the build. The work covers clearing the site, trenching for water, sewer, gas and electrical, upgrading the service panel, and passing city inspections before a single wall goes up. Call (844) 797-7958 for a free on-site estimate and a written line-item scope.

Call (844) 797-7958

How We Sequence ADU Site Prep & Utilities in Alhambra

A second-story addition that matches the existing roofline

Site work runs on a fixed order because each stage has to pass or be signed off before the next crew shows up. Here’s the realistic run, based on a typical 50-foot-wide Alhambra lot.

  • Stage 1: Site survey and utility locate (Day 1 – 2). We call 811 to mark existing gas, water, electric and communications lines, then physically confirm what’s actually underground. On pre-1950s Alhambra properties, records often disagree with reality, so we hand-dig test holes at the connection points. You decide the ADU footprint and where the utility stub-outs land.
  • Stage 2: Demolition and clearing (Day 3 – 6). Old concrete, sheds, dead trees and the rear garage come out, and we haul debris off-site. This is where we confirm whether the existing rear structure is sitting on a non-conforming setback (more on that below). You approve the haul-off and any salvage you want kept.
  • Stage 3: Grading, drainage and foundation pad prep (Day 7 – 12). We cut and fill to grade, compact in lifts, and set the pad for the ADU slab or pier-and-beam foundation. Drainage is graded away from the existing house and the new structure. You pick the foundation type if it hasn’t been decided.
  • Stage 4: Trenching and utility rough-in (Day 13 – 18). Water, sewer, gas and electrical conduit go in the ground, with the sewer run laid at the correct fall to the city main. We pull the permits for this stage and schedule the rough-in inspection. You sign off on fixture and panel locations.
  • Stage 5: Service upgrades and connections (Day 19 – 24). The main electrical panel gets upgraded if the ADU load requires it, the water meter and sewer lateral get tied in, and gas is pressure-tested. Final utility inspection follows. You get the signed-off permit packet and the as-built utility map.

Add three to five weeks on top for city plan check, and that’s the real calendar. Our technicians bring up to 12 years of experience on individual jobs, backed by the 730-Day Done Right Promise on everything we install.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make on ADU Site Prep & Utilities

Site prep isn’t glamorous, but the decisions here set your cost and your maintenance for the next 30 years. These are the ones that come up on nearly every Alhambra job.

  • Electrical service: upgrade vs. keep. A 100-amp panel usually can’t carry an ADU’s load alongside the main house. Upgrading to 200-amp runs $3,500 – $7,000 depending on meter location and trench length; keeping the existing panel works only if you add a subpanel and the utility approves.
  • Sewer lateral: replace vs. repair. Original clay laterals on 1920s – 1950s Alhambra homes crack and root-infiltrate. A full lateral replacement runs $4,000 – $9,000; spot repair is cheaper but you’ll revisit it. We camera the line before quoting so there are no surprises.
  • Foundation: slab-on-grade vs. pier-and-beam. Slab is faster and cheaper on flat lots; pier-and-beam handles uneven grade better and gives you access for future plumbing work. Grade and soil report decide this.
  • Water and gas line material. Copper or PEX for water, black iron for gas. PEX is flexible and cheaper to install; copper holds up better to heat and time. We’ll show you both in the written estimate.
  • Drainage: French drain vs. surface grading. On tight Alhambra lots, a French drain to the rear property line prevents winter pooling against the foundation. It adds $2,000 – $5,000 but saves you a wet slab down the road.

Where the ADU shell matters to the finish line, we set the groundwork to support James Hardie cladding or a Tuff Shed-style utility structure without re-doing the pad later. If you want to keep the site-prep scope inside a larger Home Additions & ADU in Alhambra project, we’ll show you how the line items stack.

What ADU Site Prep & Utilities Costs in Alhambra, CA

A framer checking new wall framing on a home addition

Here’s the honest number breakdown. These ranges are market-calibrated for Alhambra and reflect a typical rear-lot ADU site.

Line Item Typical Range
Site demo, clearing and haul-off $3,500 – $8,000
Grading, drainage and foundation pad $6,000 – $14,000
Trenching and utility rough-in $8,000 – $16,000
Electrical service upgrade (200-amp) $3,500 – $7,000
Sewer lateral replacement $4,000 – $9,000
Water and gas connections $2,500 – $6,000
Permits and inspection fees $1,500 – $4,000

Five variables push a job high or low. Distance to the connection point: a rear ADU near the alley is cheaper to hook up than one that runs 90 feet to the front-of-house meter. Existing utility condition: old clay or galvanized pipe means full replacement. Panel capacity: an undersized panel forces an upgrade. Lot grade and soil: cut-and-fill on a sloped lot adds cost. Permit scope: a utility upgrade alone is a smaller package than a full site-prep and foundation permit.

Your written estimate covers labor, materials, permits we pull, inspection scheduling and cleanup. It typically doesn’t cover landscape restoration, fencing replacement or moving a utility vault, and we’ll flag those clearly. For unrelated exterior work, homeowners often pair this with Concrete Driveways & Concrete Work in Alhambra or Paver Driveways in Alhambra to fix a torn-up access path after trenching.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Alhambra Homes Specifically Do to This Job

Alhambra is one of the most densely built-out cities in the San Gabriel Valley, and that density shows up in every site-prep job. Because lots are often only 50 feet wide, the existing rear garage or rear addition frequently sits right at or beyond the required setback. Before the city approves an ADU plan, those non-conforming conditions have to be resolved, which means a surveyor’s plot plan and a conversation with the planning counter early. On the housing side, most of what we work on is 1920s – 1960s bungalows and Spanish or California ranch cottages on tight lots, with the 1960s – 80s apartment buildings on Main Street and Valley Boulevard framing the rest of the picture. We routinely hit old knob-and-tube or early 1940s – 50s wiring that has to be brought up to code before utility inspection, original galvanized water lines or clay sewer laterals that fail a camera test, and lath-and-plaster walls that open up differently than modern drywall when a service tech has to get into the house.

Climate matters here too. Alhambra sits in the hot, dry inland basin, so summer heat stress on exterior work means we schedule concrete pours and grading early in the day, and the winter rainy season occasionally tests older flat and low-slope roof transitions right where the ADU drain tie-in runs. Wildfire smoke and Santa Ana wind events can pause exterior work for a few days at a time. We serve the 91804, 91896, 91899 and 91841 ZIPs across Alhambra, and we build the schedule around those realities instead of pretending they don’t happen. For the broader home additions scope, our Home Additions & ADU team handles the framing and finish work once the ground is prepared.

Serving Alhambra, CA – Our Local Coverage Area

We serve Alhambra and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Site Prep & Utilities in Alhambra

New painted shaker cabinets with an organized deep drawer

Get a Written Estimate for ADU Site Prep & Utilities in Alhambra

Call (844) 797-7958 to schedule a free on-site estimate for ADU site prep and utilities in Alhambra. We’ll walk the lot, check the existing panel and utility connections, and hand you a written line-item scope with a fixed price and no change orders. Our crew arrives on time, in uniform and background-checked, and the estimate is yours to keep whether you hire us or not. Live person answers around the clock.

Written by the team at Groundwork Construction Co.

Why Alhambra Chooses Groundwork Construction Co. of Burbank

We set the standard for ADU site prep & utilities in Alhambra.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Alhambra

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Alhambra Customers Say

Trusted by homeowners across Alhambra and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"Quality work and honest pricing. He is stretched across a few jobs at once so he is not always on site, though the carpenter who was there knew everything."

Whitney Norris

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodelA new roof with clean valleys and new flashing

More services in Alhambra

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Burbank

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Burbank team

A local vetted partner works across Burbank and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Alhambra?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Alhambra.

(844) 797-7958

Request a Free Estimate in Alhambra

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch