How Long Does It Take to Build an ADU? (Burbank, CA)

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Burbank
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Long Does It Take to Build an ADU in Burbank? Plan on 8 to 12 Months, and 3 of Those Are Permits

An ADU in Burbank usually takes 8 to 12 months from first design meeting to certificate of occupancy, and the single biggest reason a project runs long isn’t construction – it’s the permit path. Burbank’s Community Development Department publishes a 30-day plan check target, but that number assumes a clean submittal with no utility or fire review attached. In practice, once Burbank Water and Power review (3 to 6 weeks) and fire clearance for hillside zones (2 to 4 weeks) get layered in, most Burbank ADU projects spend 90 days or more in review before anyone breaks ground. If you’re planning around a rental income date, call (844) 797-7958 and we’ll walk you through where your specific property sits on that timeline.

A garage converted into a guest room and home office

The Five Phases of a Burbank ADU, With Real Time Ranges

Generic timeline guides say “6 to 12 months” and stop. That’s not useful when you’re trying to decide whether to start this fall or next spring. Here’s how the phases actually break down on Burbank lots:

Phase Typical Duration What Drives the Range
Pre-application & design 4-8 weeks Site survey, existing conditions, whether the lot has prior unpermitted work
Plan submission & city review 6-10 weeks Parallel BWP and fire review, corrections cycles
Permit issuance & mobilization 1-2 weeks Fee payment, contractor scheduling
Construction 8-20 weeks Attached vs. detached, garage conversion vs. new build
Final inspection & CO 2-4 weeks Utility sign-offs, punch list items

That adds up to roughly 21 to 44 weeks of active work plus the overlap between phases. The construction window alone (8 to 20 weeks) is the most predictable part of the whole project, which surprises most homeowners. If you want the deeper scope breakdown of what we build, see our Home Additions & ADU in Burbank page.

Why Garage Conversions Clear Plan Check Faster Than New Construction in Burbank

Here’s the distinction most timeline guides miss, and it matters if you’re calculating when rental income starts. A garage conversion in Burbank moves faster through plan check than a new detached ADU because a conversion of an existing structure doesn’t trigger the same fire department site review as new construction. Fire review is one of the two big add-ons to the city’s 30-day target, and skipping it pulls 2 to 4 weeks out of your review phase.

A garage conversion typically runs $30,000 to $80,000 and 8 to 14 weeks in construction, versus $90,000 to $220,000 and 14 to 20 weeks for a ground-up detached unit. That’s not just a cost difference – it’s often a two-month swing on when you can legally rent the space. For Burbank homeowners who are weighing a conversion against a full build, the conversion path is usually the one we recommend when the existing garage is structurally sound and sits above the flood line.

One caveat that comes up in the pre-application phase more than any other: unpermitted structures. Burbank’s Magnolia Park bungalows and the post-war flats near downtown routinely hide converted garages, enclosed patios, and additions from decades ago. When a permit pull surfaces one, you can’t proceed until the existing structure is either permitted retroactively or brought down – and that timeline depends entirely on how much remediation the city requires. It’s the most common cause of Burbank ADU overruns we see, and it’s why we walk the property before drawing anything. A dry, hot San Fernando Valley climate also means drainage and roof conditions around a converted garage get a second look that wouldn’t happen on a newer structure.

A framer checking new wall framing on a home addition

Working Around Production Schedules and Rental Deadlines

A lot of Burbank homeowners are on entertainment-industry timelines – a production wrap date, a lease start date, a window between shoots when a construction site won’t interfere with a home office or a soundstage-adjacent schedule. When inspection scheduling slips, it isn’t just an inconvenience; it’s a lost rental month or a scheduling conflict that pushes everything downstream.

That’s where live answer around the clock changes the project. Being able to reach someone at 7 p.m. on a Friday about an inspection slot or a subcontractor reschedule is a scheduling tool. Most delays in the construction phase don’t come from slow work – they come from the space between trades, where a mechanical rough-in waits a week for the electrician who’s booked out. A single contractor coordinating framing, mechanical, electrical, and finish through one schedule eliminates those gaps. That’s the real reason a full-scope builder compresses construction time, and it’s not a marketing claim – it’s a schedule math problem. The home page lays out how our seven service lines fit together under one project manager, and the same approach applies to roofing, windows, and additions when the scope grows.

What an ADU Costs in Burbank, With the Timeline Implications

The lead cost range for ADU construction in Burbank is $45,000 to $130,000 for smaller or conversion-based scopes, and $90,000 to $220,000 for full detached units. Kitchen finishes inside an ADU run $14,000 to $45,000 depending on the layout, bathroom finishes run $9,000 to $28,000, and if you’re adding impact-rated windows for fire-zone compliance, expect $8,000 to $25,000. PGT and CGI both build impact-rated products that meet what hillside zones above the Verdugo foothills require.

  • Garage conversion: $30,000-$80,000, 8-14 weeks construction
  • New detached ADU: $90,000-$220,000, 14-20 weeks construction
  • Attached ADU (addition): $45,000-$130,000, 10-16 weeks construction
  • Impact windows: $8,000-$25,000

Material selection can compress a schedule as often as it stretches one – locked-in lead times on windows and cabinets are the biggest cause of construction-phase slippage, so the earlier those are ordered against the plan, the less idle time sits between framing and finish work. Boral and CWS products are both strong on that front for ADU exteriors and trim.

FAQs

Getting a Real Timeline Before You Commit

Generic timelines tell you months. A real one tells you which months. If you’d rather have it looked at, Groundwork Construction Co. of Burbank offers a no-pressure assessment in Burbank – call (844) 797-7958 for a free project estimate and design consult, and we’ll map out the permitting path for your specific property before any drawings start.

Written by the team at Groundwork Construction Co. of Burbank, serving Burbank, CA.

Getting started with Groundwork in Burbank

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Burbank team

A local vetted partner works across Burbank and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Burbank? Licensed & insured · free written estimates
Call (844) 797-7958
Local Service Coverage

Request a Free Estimate in Burbank

Tell us what you need - Groundwork Construction Co. of Burbank responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch