Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterADU Design & Permitting in Burbank, CA
ADU design and permitting in Burbank means turning a plan for a backyard cottage, garage conversion, or junior unit into stamped drawings and an approved building permit before a single two-by-four goes up. The design phase decides what your lot can legally hold, and the permit phase is where most projects stall. We handle both under one roof, then build the unit ourselves, so the drawings you approve are the ones that get framed and signed off. Groundwork Construction Co. of Burbank does this work start to finish, and you can reach us at (844) 797-7958 for a free design consult.
Burbank is one of the harder cities in the San Fernando Valley to build an ADU in, and we say that from the plan-check counter, not a brochure. The city runs its own zoning review, its own historic overlays, and a hillside building code that trips up out-of-town drafters who assume every lot in Los Angeles County behaves the same way. When we design and permit your unit, we’re designing for the specific block it sits on, not a template. If you’re still deciding what type of addition fits your property, our Home Additions & ADU in Burbank page covers the full range of options, from standard additions to detached units and conversions.
Most of our ADU clients come to us after a previous attempt went sideways: a set of plans that got red-tagged, a designer who disappeared after the deposit, or a contractor who promised a permit and never pulled one. We start by telling you what your lot will realistically allow, what the city will realistically approve, and what it will realistically cost, before you spend a dime on drawings.
Key Takeaways
- Design and permitting in Burbank usually runs $8,000 to $28,000 depending on unit type, site constraints, and whether your lot is in a hillside or historic overlay.
- Burbank reviews ADU plans through its own building and planning departments, so a generic county packet still needs local adjustment.
- Garage conversions are the fastest and cheapest path when your lot is tight; detached units cost more but can be larger.
- Every project is backed by our 730-Day Done Right Promise, and the number we quote is the number you pay.
- Our technicians have up to 12 years of experience and arrive background-checked and in uniform, ready to work the drawings through to an approved permit.

When You Need ADU Design & Permitting
Here are the situations Burbank homeowners call us about most often. If any of these sound familiar, you’re in the right place.
- You want rental income from your backyard. With Burbank rents where they are, a detached unit can pay for itself faster than almost any other home improvement. You need a design that squeezes a livable unit onto a lot that already has a house, a driveway, and a couple of mature trees.
- A parent or adult child needs to move in. Multigenerational living is the number one reason families in Burbank ask about ADUs. Design and permitting need to account for accessibility, privacy from the main house, and utility separation so everyone isn’t sharing a meter and a hallway.
- You want to convert your garage. Burbank has thousands of detached garages behind single-family homes, and many of them are the easiest, least expensive ADU on the table. But a garage conversion still needs a permit, and it needs structural, insulation, and egress upgrades that most owners don’t realize until an inspector points at them.
- Your lot is in a hillside area or a historic district. Hillside neighborhoods and the city’s historic resource zones carry extra review layers. Design has to respect existing setback and lot-coverage constraints, and permitting has to clear design review before a building permit is ever issued.
- A previous designer’s plans got rejected. We see plans come back with corrections every month because the drafter didn’t account for Burbank’s specific zoning interpretation. We pick up where the last attempt stopped and get the drawings into a form the city will actually approve.
- You’re selling and want to add value first. A permitted, finished ADU adds a real second dwelling unit to your property, not a granny flat someone built without paperwork. Design and permitting done right now save a buyer’s inspection from becoming a negotiation later.
Our ADU Design & Permitting Process
We don’t hand you off to a separate architect and wish you luck. The same team that designs your unit walks the plans through the city and then builds it. Here’s how the process runs from first call to approved permit.
- Site and feasibility walk. We come to your property, measure the lot, check setbacks, look at grading and utilities, and talk through what you want the unit to do. Within a few days you get a plain-English summary of what your lot supports and what it doesn’t. No charge for this consult.
- Concept and unit type selection. Detached unit, attached unit, garage conversion, or junior ADU inside the main house? Each has different cost and timeline implications, and the right answer depends on your lot, your budget, and how you plan to use the space. We recommend one path and explain the trade-offs.
- Schematic design and full drawing set. We produce the architectural drawings, structural engineering, and site plan the city will require, coordinated across the trades. If your project calls for exterior finishes, we’ll specify materials from trusted partners like James Hardie siding so the unit matches the house instead of looking bolted on.
- Plan submittal and plan-check navigation. We submit to Burbank’s building and planning departments and respond to corrections on your behalf. This is where projects live or die, and it’s the step most owners underestimate. We stay on it until the permit is issued.
- Permit issuance and pre-construction scheduling. Once the permit is in hand, we move straight into construction scheduling. You don’t have to re-shop for a builder, because we’re already the builder. One company from drawings to final inspection.
Throughout the process you get a live person on the phone, 24/7. When the city sends a correction at 4:45 on a Friday and you want to know what it means before Monday, call us and get a real answer. That responsiveness is the difference between a permit that moves and a file that sits.

ADU Design & Permitting Pricing in Burbank
ADU design and permitting in Burbank typically costs between $8,000 and $28,000, and that range covers everything from a simple garage-conversion drawing set to a full detached-unit package with structural engineering, site survey, and historic review. The design and permitting fees are a small slice of the total project, but they’re the slice that determines whether everything else can happen.
To give you a real picture, here’s roughly how the line items break down for a typical Burbank project:
- Feasibility review and site walk: included with our free design consult.
- Architectural drawings and site plan: $4,000 to $12,000, depending on unit size and complexity.
- Structural engineering: $1,500 to $4,500, driven by foundation and framing requirements.
- Survey and grading plan: $1,200 to $3,500, more on sloped or hillside lots.
- Burbank plan-check and permit fees: $2,500 to $8,000, set by the city and scaled to project valuation.
- Historic or design review (where applicable): $1,000 to $3,000 for additional submittal and response work.
Several things move that number up or down. A flat lot with an existing detached garage sits at the low end; a hillside property with grading, retaining, and design review sits at the high end. A junior ADU built inside the existing footprint of the house is usually the lowest-cost option, because the structure and utilities are largely there. A detached unit gives you the most design freedom and the highest value, but it costs more across the board. And a garage conversion sounds simple until you factor in new egress windows, upgraded insulation, and structural changes the city will require.
We quote the design and permitting work upfront, in writing, before we start. The number you see is the number you pay. On top of the design fee, our construction pricing comes with $1,000 off projects over $10,000 and 0% financing for 18 months, so the whole project stays financially manageable without turning into a revolving credit card. Call (844) 797-7958 for a free estimate and design consult specific to your property.
What Affects the Cost of ADU Design & Permitting in Burbank
- Unit type. Junior ADU, garage conversion, attached unit, or detached unit, each with its own drawing and engineering scope.
- Lot conditions. Slope, grading, drainage, and whether the lot sits in a hillside zone.
- Overlays and design review. Historic or special-designation areas add submittal rounds.
- Utility runs. Bringing water, sewer, and electrical to a detached unit costs more than tying into the main house.
- Revision count. Clean drawings that anticipate the city’s concerns mean fewer correction cycles and lower total fees.
Why We Handle Design and Permitting In-House
When the designer and the builder are two different companies, the handoff is where budgets blow up. Drawings get value-engineered after the fact, or the builder discovers something the designer didn’t account for and the change order lands on you. Running design, permitting, and construction under one company means the plan you approve is the plan that gets built, and there’s no finger-pointing when something needs to change. Our technicians have up to 12 years of experience in the field, and they build what they draw.
We also bring real material choices into the drawings early. If your ADU is going to have a kitchenette, we specify cabinetry from partners like KraftMaid so the layout in the drawings matches what’s installed. Bathrooms, windows, doors, roofing, siding, all of it gets decided at the design stage, not during construction when lead times and availability start dictating the plan. That’s how you get a unit that looks intentional instead of assembled.
And every project carries our 730-Day Done Right Promise. If something isn’t done right, we make it right, and that guarantee covers the work we put in writing on the front end, including the construction that follows the permit.
FAQs – ADU Design & Permitting
How much does ADU design and permitting cost in Burbank?
ADU design and permitting in Burbank generally runs $8,000 to $28,000, with simple garage conversions near the low end and detached units on constrained or hillside lots near the high end. The price includes architectural drawings, structural engineering, survey work, and Burbank’s plan-check and permit fees. Call (844) 797-7958 for an exact quote on your property, because estimates and design consults are free.
How long does it take to get an ADU permit in Burbank?
Plan review and permitting in Burbank typically takes 3 to 6 months from submittal to issued permit, though straightforward garage conversions can move faster and projects with design review can run longer. The timeline depends heavily on how complete and how local the drawings are, since correction cycles are the biggest source of delay. We manage the submittal and respond to corrections on your behalf, and you can call us any time, day or night, for a status update.
Can I convert my existing garage into an ADU in Burbank?
Yes, garage conversions are one of the most common ADU types in Burbank, and they’re often the fastest and most affordable path, provided the structure and lot meet code for egress, insulation, and utilities. A garage conversion still needs a permit, structural upgrades, and utility work, and the city will require the drawings to show all of it. We assess whether your specific garage will convert cleanly before any drawings are drawn, so you don’t spend on a plan the city won’t approve. Call (844) 797-7958 to schedule the free site walk.
Do I need a designer and a separate contractor for my ADU in Burbank?
No, you don’t need two companies, and working with one company that designs, permits, and builds your ADU usually costs less and creates fewer delays. When design and construction are split, the handoff is where budgets slip and schedules break. We keep it under one roof, from drawings through final inspection, and back the whole project with our 730-Day Done Right Promise.
Is my Burbank property even eligible for an ADU?
Most single-family lots in Burbank can support some form of ADU, but eligibility depends on lot size, setbacks, existing structures, and whether the property sits in a hillside or historic overlay. The only way to know for certain is a site-specific review, which is why we walk the property before quoting a design fee. Call (844) 797-7958 and we’ll tell you what your lot can realistically hold.
Whether you’re converting a garage, adding a detached unit for family, or building a rental income property, ADU design and permitting in Burbank is the step that decides what’s possible. We design it, permit it, and build it, with upfront pricing, live answers around the clock, and a 730-Day Done Right Promise that puts the commitment in writing. If you’re planning an addition or ready to see what your property can support, our home team is one call away. Dial (844) 797-7958 for a free estimate and design consult with Groundwork Construction Co. of Burbank.
Written by the team at Groundwork Construction Co. of Burbank, serving Burbank.