A Groundwork company - serving Burbank, CA

5 Mistakes to Avoid With Fence Installation

November 16, 2026 • Groundwork Construction Co. of Burbank

5 Mistakes to Avoid With Fence Installation

5 Mistakes to Avoid With Fence Installation

The number one reason a new fence fails in the first three years usually has nothing to do with wood or vinyl. It’s that the post holes got dug before anyone called 811, and an underground utility hit forced a full relocation mid-job. The five most expensive fence mistakes in Burbank are process failures, not material failures, and they happen before the first post goes in the ground. If you’d rather hand the whole thing to someone who’s seen these go wrong, call (844) 797-7958.

Call (844) 797-7958

Key Takeaways

  • Call 811 before digging, especially in older Burbank neighborhoods with unmapped irrigation lines.
  • Know Burbank’s front yard (42 inches) and rear yard (6 feet) fence height limits before you build.
  • Post depth has to account for wind load near the Verdugo Mountains, not just fence height.
  • Concrete needs a drainage path, or your posts rot below grade faster than anything else.
  • Get a written scope that names post spacing, concrete mix, and footing depth in inches.

1. Skipping the 811 Utility Locate Call in Burbank

A new stained cedar privacy fence

Calling 811 before you dig is the law in California, and it’s free. But in Burbank it’s also a job-saving step that matters more than it does in newer suburbs. Older neighborhoods around Magnolia Park and Rancho Equestrian were built when irrigation lines and old clay drain pipes were laid loose and sometimes never mapped. We’ve seen a single struck irrigation lateral flood a trench that took two days to re-dig. And in the hillside streets off Sunset Canyon, a buried gas line near a shared property line can turn a weekend fence project into an evacuation.

Here’s the part most people miss: the 811 locate covers utility-owned lines, not the private ones on your own property. That means the sprinkler feed, the line to a detached garage, or the conduit a previous owner ran to a shed out back are all on you to find. If you don’t know where they are, have them scanned before digging.

  • Call 811 at least 2 to 3 working days before you dig – it’s the minimum notice window in most of southern California.
  • Hand-dig near any marked line – machine augers hit what shovels survive.
  • Ask your contractor to show you the locate ticket – if they never called, that tells you what the rest of the job will look like.

Real builders treat the locate ticket as the first document on the job, not the last. The local pro we connect homeowners with is licensed and insured as the state requires, and any real professional runs this step without being asked.

2. Building Without Knowing Burbank’s Fence Height Rules

Burbank’s fence height limits vary by where the fence sits on the lot, and homeowners get caught off guard constantly. A fence in the front yard can generally go up to 42 inches before you need permits and approvals. Move to the rear yard and 6 feet is the common line. Anything taller, or anything placed in a required front setback, usually triggers a permit or a variance process. The catch is that a lot of Burbank lots slope, and the “front yard” line isn’t always where people assume it is.

Skipping a required permit is one of the fastest ways to end up tearing down a fence you just paid for. City inspectors can require removal of a structure built without approval, and that’s a full loss on the fence, not a partial one. Permit costs add a few hundred dollars to a project; a failed inspection and rebuild doubles it.

  • Front yard: generally capped at 42 inches without approval.
  • Rear and side yard: commonly 6 feet, with corner lot sight-triangle rules that can lower it.
  • Retaining + fence combos: a fence on top of a retaining wall is measured from the wall, not from grade.
  • Corner lots: sight triangles at intersections can restrict fence height regardless of the yard.

Before you design anything, pull your property’s zoning and confirm the height limit for the fence line you’re actually building. If you want that part handled for you, see our Fence Installation in Burbank page.

3. Setting Post Depth Based Only on Fence Height

A new front yard fence with a matching gate

Wind load is the silent killer of Burbank fences. The Verdugo Mountains sit right against the city, and the Santa Ana wind events that funnel through the foothills create gusts that flatten fences built on shallow footings. Post depth should account for wind zone, soil type, and fence height together, not one alone. A 4-foot fence and a 6-foot fence in the same yard often need different footing depths, and a solid privacy panel catches far more wind than a picket or lattice design.

The rule of thumb builders use is “one-third of the post in the ground,” but that’s only a starting point. In Burbank’s clay-heavy soil, a 6-foot post needs to run 24 to 30 inches deep with a wider footing to resist lateral movement from wind and to keep the post from rocking. Sandy soil near the washes behaves differently again. Wind pressure on a solid panel fenced in an exposed hillside spot has to be planned for from day one.

  • Clay-heavy soil (common in Burbank flats): deeper, wider footings resist rocking and frost-heave style movement.
  • Sandy or loose fill: firmer compaction and sometimes a wider concrete collar.
  • Exposed spots near the Verdugo foothills: increase depth and consider adding bracing.
  • Fence height: a 6-foot privacy fence needs more footing depth than a 4-foot picket.

If a contractor quotes you a price without asking about your soil or wind exposure, they’re guessing. A written plan should name the footing depth in inches, not use the word “adequate.”

4. Pouring Concrete Around Posts With No Drainage Path

Concrete that fully encases a wood post traps moisture against the wood, and that trapped moisture rots the post below grade faster than any single other installation choice. The ground around a post stays damp after rain, moisture wicks into the wood at the soil line, and within a few seasons the post is soft at its most critical point. Manufacturers like Barrette and Master Halco make steel posts that sidestep this entirely; for wood posts, the fix is a small drainage gap and a concrete footing shaped to shed water, not a flat pool around the post.

We pulled a fence out of a yard over in Magnolia Park last month that was only four years old, and every third post had rotted through at the soil line. The wood above grade was still solid. The concrete had trapped water around the base like a saucer, and the trapped moisture did the rest.

  • Crown the concrete so it slopes away from the post and sheds water.
  • Leave a small gap between wood and concrete so water drains, then seal it.
  • Use a post base or bracket in high-moisture spots instead of burying wood in concrete.
  • Pick pressure-treated or steel posts for any post that sees standing water.

The material choice matters, but the detail matters more. A premium post set badly rots faster than a basic post set right. That’s the difference between built to last and built to repair.

5. Hiring a Crew Without a Written Scope of Work

A new black aluminum pool fence with a gate

A verbal “we’ll set the posts at the right depth” is the reason settling fences end up in legal disputes. A written scope has to spell out post spacing in feet, the concrete mix, footing depth in inches, post material, and how the fence handles grade changes on a sloped lot. Without those specifics written down, you have no recourse when the fence settles unevenly a year later, and the crew can point to “normal settling” as the answer.

Settling usually shows up as posts that sag, gates that drag or catch, and panels that bow out of line. A written scope and a real workmanship warranty are your two best defenses. Groundwork Construction Co. covers fence work under the 730-Day Done Right Promise, and the local pro we connect you with should stand behind the install in writing for at least as long. Confirm the warranty terms before signing, not after the crew leaves. Merely one year of workmanship coverage isn’t enough for a structure that has to survive Burbank wind events.

  • Post spacing: usually 6 to 8 feet for most materials; wider spacing means weaker panels.
  • Concrete mix: a standard bagged mix is typical, but for heavy gates and hard soil, a higher-strength mix may be warranted.
  • Footing depth in inches: spelled out for every post, not summarized as “deep enough.”
  • Grade handling: how the fence steps up a slope so panels don’t bridge gaps.
  • Gate hardware and posts: specify heavy-duty hinges and a reinforced gate post.

When to Call a Pro

Digging post holes in Burbank clay by hand is hard work, and hitting an unmapped line or setting a footing wrong costs more to fix than it saved. If your yard has a slope, sits near the Verdugo foothills, has existing irrigation, or sits on a corner lot with sight-triangle limits, hand this to someone who plans the job before they dig. Our Driveway & Pavers in Burbank page covers the hardscape side of the same planning decisions if you’re doing the whole yard at once.

Related services in Burbank:

The Bottom Line

The five mistakes that cost Burbank homeowners the most money on fence work are all avoidable. Call 811 before digging, confirm your front and rear yard height limits, plan post depth for wind and soil, shape concrete so it sheds water, and get a written scope that names every number. Skip any of those and the fence looks fine on installation day and fails within a few seasons.

If you’re in Burbank and need help, Groundwork Construction Co. of Burbank offers free estimates. No-hassle upfront pricing means the number you see is the number you pay, and calls are answered by a live person around the clock. Call (844) 797-7958, and we’ll walk through the plan, the permits, and the scope before anyone touches a shovel. Start at our Groundwork Construction Co. of Burbank home page to see the full range of work.

Frequently Asked Questions

Need Construction Help?

Call Groundwork Construction Co. of Burbank - the local pro we connect you with is licensed and insured, here with fast after-hours help in Burbank.

(844) 797-7958
Local Service Coverage

Request a Free Estimate in Burbank

Tell us what you need - Groundwork Construction Co. of Burbank responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch