Cabinets & Countertops in Pasadena, CA: What the Job Actually Costs and How Long It Takes
New cabinets and countertops in Pasadena typically run $14,000 – $45,000 for the combined job, with most single-kitchen projects landing in the $18,000 – $28,000 range. Plan on two to three weeks of working time once materials are on site, plus a template-to-install gap of five to ten business days for stone counters. Call (844) 797-7958 for a free on-site estimate with a written, line-item quote before anything gets ordered.
We treat cabinets and countertops as one job with a fixed sequence, because the two are physically dependent on each other: no counter template until the cabinet boxes are set and level.
How We Run a Cabinet and Countertop Job, Stage by Stage

1. Site visit and cabinet layout (day 1, about 90 minutes)
We measure every wall, check for out-of-square corners, and note where the existing plumbing and electrical land. In Pasadena’s older homes, this is where we find the surprises: a wall that’s an inch out over eight feet, or a supply line that’s inside the footprint of where a new sink base needs to go. You decide the cabinet layout and door style at this visit. Bring a rough budget number so we can steer you toward the right cabinet line rather than showing you options you’ll never pick.
2. Order, lead time, and the design freeze (weeks 1 – 5)
Cabinet lead times are the longest link in the chain. Semi-custom KraftMaid or Wellborn orders typically run four to six weeks; stock lines can be two to three. Once you sign off on the layout, the order freezes: changing a box size after this point usually adds weeks and a restocking fee. This is the stage where you settle the countertop material, because stone slabs need to be selected and held before fabrication gets scheduled.
3. Demo and rough prep (days 1 – 2 on site)
Out go the old cabinets, counters, and usually the backsplash. We protect the floors and isolate the work area. Anything that has to move – a gas line to a new range position, an outlet for a relocated microwave, a drain that shifts with a new sink location – gets roughed in now, before walls close back up. If the existing counters are stone and in good shape, we’ll tell you straight whether they’re worth saving.
4. Cabinet install and counter template (days 3 – 5, then a wait)
Boxes go in, shimmed and leveled, then uppers, fillers, and crown. Once everything is set, the countertop fabricator comes out to template. That template takes an hour; the fabrication that follows runs five to ten business days for quartz or granite. Nothing about this gap is avoidable – it’s how stone work is done.
5. Counter install, sink set, and final walkthrough (final 2 – 3 days)
Slabs go in, the sink and faucet get set, and we caulk, touch up, and test every drawer and door. You walk the kitchen with us and sign off against the original line-item quote. That’s also when the 730-Day Done Right Promise gets explained in writing – if something isn’t right, we come back and make it right inside that window.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
Most of the decisions that shape a Pasadena cabinets and countertops project land in five buckets:
- Cabinet construction – stock vs. semi-custom vs. full custom. Stock is the cheapest and fastest, but limited in sizes, so odd walls get filled with awkward filler strips. Semi-custom (KraftMaid and Wellborn both sit here) gives you the size range you need for older homes. Full custom costs the most and takes the longest, and it’s usually only worth it for a historic home where nothing standard fits.
- Door material and finish. Painted MDF looks clean and modern and holds up well in a dry interior; it does not like a steamy kitchen without good ventilation. Wood veneer and thermofoil each have their own quirks – thermofoil can peel at the edges over time, and veneer shows dings.
- Countertop material. Quartz is the default for a reason: it doesn’t need sealing and shrugs off the acidic things that stain natural stone. Granite is priced comparably now and gives you a look nobody else has, since every slab is different. Butcher block and laminate come in at the low end for budget-driven projects.
- Sink and cutout style. An undermount sink costs more to install than a drop-in, but it’s easier to wipe clean. A farmhouse apron sink adds labor because the cabinet has to be modified to accept it.
- Storage upgrades. Soft-close drawer slides, pull-out trash, and deep drawer banks for pots are worth the money; a lazy Susan in a corner is worth it too. Don’t skimp here, since you’ll interact with these moving parts every single day.
What Cabinets & Countertops Costs in Pasadena, CA

The combined job runs $14,000 – $45,000. Break it down:
- Cabinet installation: $4,000 – $13,000 for a typical kitchen’s worth of boxes, depending on box count and whether you’re reusing any existing cabinets.
- Countertop installation: $2,000 – $6,500 for quartz or granite, fabrication and template included.
- Island (if you’re adding one): $3,000 – $10,000, higher if the island needs plumbing or a downdraft vent.
What pushes a job toward the high end: a larger footprint (more boxes, more counter edge), a wall that’s badly out of square and needs shimming and scribing, moving plumbing or a gas line to relocate the range, and stone countertop grade – a premium quartz or a book-matched slab sits well above a standard range. What keeps a job near the low end: keeping the sink and range where they are, choosing a stock or semi-custom cabinet line, and going with a mid-grade quartz.
Every quote we write is line-item: cabinets, counters, labor, haul-away, and permit fees named separately. The number you see is the number you pay, unless you approve a change order yourself. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off. Call (844) 797-7958 for an exact figure on your kitchen.
See the difference
Before
After
Before
After
Before
AfterWhat Pasadena Homes Specifically Do to This Job
Pasadena’s housing stock is the single biggest wildcard on any cabinet and countertop job here. Craftsman bungalows in Bungalow Heaven and the period-revival homes around the Arroyo were built between the 1890s and 1930s, which means lath-and-plaster walls that don’t take a cabinet screw the way drywall does, and knob-and-tube wiring that often surfaces the moment the wall behind the old cabinets comes open. In the 91104 and 91106 ZIP codes, we routinely find original galley kitchens squeezed into a 9-by-11 footprint, and the fix is rarely “order bigger cabinets” – it’s rethinking the layout entirely, sometimes as part of a full Kitchen Remodeling in Pasadena.
There’s a second layer specific to Pasadena: the historic preservation rules. The city’s Cultural Heritage Ordinance and its concentration of designated landmarks mean that even an interior-driven kitchen update can trigger a review if it touches exterior elements like a window or an exterior wall. On Bungalow Heaven and Marengo Avenue properties, that review can add weeks to the schedule. We build that timeline into the bid up front rather than discovering it mid-project.
We work across Pasadena, including South Pasadena, San Marino, Altadena, and East San Gabriel. If the project is a bigger scope than cabinets alone, our Kitchen Remodeling service covers the whole kitchen, and homeowners often pair a cabinet and counter job with a Garage Conversion ADU in Pasadena if they’re adding living space at the same time, or a New Detached ADU in Pasadena on a deeper lot.
Serving Pasadena, CA – Our Local Coverage Area
We serve Pasadena and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Pasadena

Expect three to five weeks from signed contract to finished kitchen, with two to three weeks of that being actual on-site work and the rest cabinet lead time and counter fabrication. The counter template-to-install gap alone is five to ten business days, and the on-site demo and cabinet install runs about a week. Call (844) 797-7958 to get a firm date range for your kitchen.
Straight cabinet and counter replacement usually does not require a permit. The moment you move plumbing, add or relocate electrical, or take down a wall, it does – and in Pasadena’s historic districts, exterior-touching work may also trigger a landmark review. We pull the permits and pass the inspections, and we tell you before work starts whether your job needs one.
Yes, and that’s how most jobs here run. Keeping the sink and range in place preserves the existing plumbing and gas lines and is the single biggest cost saver. The trade-off is that the layout stays as-is, which in some of Pasadena’s older galley kitchens means less storage than you’d like.
Plan for $14,000 – $45,000 combined, with $18,000 – $28,000 the most common range for a full-size kitchen. Cabinet installation alone runs $4,000 – $13,000 and counters $2,000 – $6,500, both depending on material grade and whether plumbing or gas has to move. Call (844) 797-7958 for an exact quote – estimates are free.
Every cabinet and countertop job we do is covered by the 730-Day Done Right Promise – two full years of workmanship coverage, and if something we installed isn’t right, we come back and fix it at no charge. Product warranties from the cabinet and slab manufacturers apply on top of that. That’s one of the longest workmanship guarantees in the residential construction space, and it’s in writing.
Get a Free Cabinets & Countertops Estimate in Pasadena
Call (844) 797-7958 and we’ll schedule a free on-site estimate at your Pasadena home. We’ll measure the kitchen, walk you through cabinet lines and counter options at your price point, and hand you a written line-item quote with the total you’ll pay. A live person answers around the clock, so call whenever works for you.