







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterTub to Shower Conversion Cost in Burbank, CA: What You’ll Actually Pay
Tub-to-shower conversion in Burbank typically runs $9,000-$28,000, and the single biggest variable is whether the drain has to move. In most Burbank conversions, it does. That one line item, saw-cutting the slab to reposition the drain, is required by code, inspected under permit, and it’s the number most online cost guides quietly leave out. We give you an upfront price before demo, so nothing gets discovered after the tile is ordered. Call (844) 797-7958 for a free estimate and a straight answer on your bathroom.

Why Your 1958 Burbank Ranch Bathroom Costs More to Convert Than the Online Guides Say
The drain in your post-war Burbank ranch bathroom sits where the tub was designed to put it, not where a walk-in shower needs it. Those are two different spots on the floor, and closing that gap is where most tub-to-shower budgets blow up.
Here’s the physical reality. Burbank’s 1950s and ’60s ranch stock, the post-war flats near downtown and the tract homes climbing toward the Verdugo edges, sits on concrete slab foundations. The original tub drain runs to a P-trap set in that slab at a point that made sense for a tub and makes no sense for a shower pan. To move it, a crew saw-cuts the concrete, excavates to the trap, re-routes the drain and re-pours. It’s inspected. It’s permitted. And it’s a line item that can swing your total by roughly $1,500 to $3,000, which is why a figure you pulled off a national cost calculator and a real Burbank quote often don’t match.
That’s not a contractor padding the bid. It’s what happens when you put a shower where a tub used to be in a slab-on-grade house. We tell you the number upfront, before the first tile is ordered, so your budget reflects the actual floor under your feet.
What a Tub-to-Shower Conversion Costs in Burbank, Line by Line
Here’s how the scope breaks down at each tier, plus the common line items that push a job up or down. Ranges below reflect Burbank market pricing.
| Line item | Typical range |
|---|---|
| Full tub-to-shower conversion (Burbank, all-in) | $9,000-$28,000 |
| Entry conversion: prefab surround, minimal drain move | $3,500-$10,000 |
| Mid-range: custom tile, standard glass enclosure | within full range, mid band |
| High-end: frameless glass, niche detailing, full wet-wall retile | top of full range |
| Slab penetration & drain relocation | $1,500-$3,000 |
| Walk-in shower installation (separate scope) | $4,500-$12,000 |
| Shower replacement only | $3,000-$8,500 |
| Bathroom vanity installation | $800-$3,000 |
The tier you land in comes down to a few specific variables:
- Drain position. A short lateral move still means slab work. A long move toward a new wall changes the P-trap depth and the re-pour footprint.
- Surround material. Prefab acrylic or fiberglass panels keep cost down. Full custom tile, especially a full wet-wall retile, is the main lever upward.
- Glass. A framed standard enclosure and a frameless panel sit at opposite ends of the glass budget.
- Waterproofing depth. A proper pan liner and wet-wall membrane behind the tile add cost but are exactly where cheap jobs fail.
- Hidden conditions. In older Burbank houses, opening the wall can reveal original lath-and-plaster or outdated valve plumbing that has to be brought up to code.
It’s the same reason a full Bathroom Remodeling scope in an older home prices differently than a cosmetic refresh: the work behind the surface is what drives the number.

The Permit Reality Most Burbank Guides Skip
Burbank requires a permit for a tub-to-shower conversion that involves drain relocation, and that means an inspection of the rough plumbing before the slab is closed and the tile goes on. A contractor who waves off the permit is exposing you to unpermitted plumbing that surfaces the moment you sell, when a buyer’s inspector or the city pulls the record. We pull the permit and coordinate the inspection as part of the job. It’s not optional, and it protects the value of your home in a city that takes building-safety enforcement seriously. If a bid comes in suspiciously low, ask whether the permit and slab work are in it.
Why Waterproofing Is Where Cheap Conversions Fail
The visible tile is the part you admire. The pan liner and wet-wall membrane behind it are the part that decides whether the shower still works in ten years. A tub-to-shower conversion is one of the few bathroom jobs where the failure point is entirely hidden, which is why we tie our workmanship to the 730-Day Done Right Promise, one of the longest in residential construction. That guarantee covers the waterproofing underneath, not just the tile on top. If the pan or membrane fails, we make it right. Built to last, backed in writing.
You’re also choosing real materials, not just whatever’s in stock. Our brand partners span every trade, and customers planning a larger Burbank remodel often match bath finishes to the same quality lines they’re using elsewhere in the house. For the full-range story, see Bathroom Remodeling in Burbank.
What Moves the Project Beyond a Simple Conversion
Plenty of Burbank conversions start small and grow once the wall is open. If your bathroom needs more than the shower, it’s worth knowing where costs land across the wider service range:
- Bathroom remodel, full scope: $9,000-$28,000
- Small bathroom remodel: $5,000-$12,000
- Cabinet installation (vanity upgrade): $4,000-$13,000
- Countertop installation: $2,000-$6,500
We also handle the rest of the property when a project turns into more than one room. That can mean home systems and exterior work, ADU additions, or a garage conversion for households adding space. These carry their own budgets, from roughly $30,000-$80,000 for a garage conversion to $90,000-$220,000 for an ADU, and we scope them separately so you can compare apples to apples.
Answers Before You Book
How much does a tub-to-shower conversion cost in Burbank?
Expect $9,000-$28,000 for a full conversion, with drain relocation adding roughly $1,500-$3,000 on the slab-on-grade ranch homes dominant in Burbank. Call (844) 797-7958 for an exact quote; estimates are free.
Is it cheaper to repair the tub or replace it with a shower?
Repairing a working tub is almost always cheaper short-term, but if the tub is failing, a conversion usually wins on long-term value and accessibility. A conversion runs $9,000-$28,000; a shower replacement alone runs $3,000-$8,500. Call us for a straight comparison.
Can you finish my Burbank conversion the same week?
Smaller conversions with a prefab surround can sometimes wrap in a handful of days, while custom tile and frameless glass jobs take longer for waterproofing and cure time. We’ll give you a clear schedule with your upfront price; call (844) 797-7958 to book.
Do you handle the permit for the drain relocation?
Yes. Drain relocation is permitted and inspected in Burbank, and we coordinate it as part of the job. You can call (844) 797-7958 with questions before anything is signed; estimates are free.
Ready to price your conversion the right way, with the slab work in the number from day one? Groundwork Construction Co. of Burbank gives you upfront pricing, no surprises, background-checked uniformed technicians, and a live person on the phone 24/7. Call (844) 797-7958 for a free estimate, and take $1,000 off projects over $10,000 or 0% financing for 18 months.
Written by the team at Groundwork Construction Co. of Burbank, serving Burbank, CA.
What Our Customers Say
"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."
- Angela Wong"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."
- Laura Bennett"Quality work and honest pricing. He is stretched across a few jobs at once so he is not always on site, though the carpenter who was there knew everything."
- Whitney Norris












