A Groundwork company - serving Burbank, CA
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · La Crescenta-Montrose, CA

ADU Site Prep & Utilities in La Crescenta-Montrose - One Fixed Price, Permits Handled

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Burbank
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in La Crescenta-Montrose: What It Costs and What It Takes

ADU site prep and utilities in La Crescenta-Montrose runs $45,000 – $130,000 for the groundwork phase alone, and most hillside lots we see take 6 – 10 weeks from first stake to final inspection. That number covers excavation, grading, drainage, foundation, and getting water, sewer, gas, and power to the future unit. It doesn’t cover the ADU itself. If you’re pricing one of these builds, call (844) 797-7958 and we’ll walk your lot and give you a real number in writing.

Call (844) 797-7958

How We Run Site Prep & Utilities, Stage by Stage

A remodeled family room with new windows and a window seat

Site prep for an ADU isn’t a weekend of digging. It’s a sequence where each stage depends on the one before, and where a surprise on day two can reset the schedule. Here’s what actually happens.

Stage 1: Site walk, survey, and utility locating (days 1 – 3)

We start by surveying the lot and marking every existing utility line. On foothill properties we’re often verifying a septic field, an old sewer lateral, or a gas stub that isn’t where the records say. You’ll decide the unit’s rough footprint and orientation at this point, because driveway access and excavation equipment routing both hinge on it. This is also when we test soil and check for undocumented retaining walls tucked into the slope.

Stage 2: Permits and engineering (weeks 2 – 6, often running in parallel)

Site work means grading permits, drainage plans, and sometimes a soils report or slope-stability review. In unincorporated pockets of La Crescenta-Montrose that approval path runs through LA County, and it takes longer than it would in a nearby incorporated city. You’ll be deciding the drain location, the pad elevation, and the utility trench routes while this paperwork moves.

Stage 3: Demolition and rough grading (days 3 – 10)

Once permits clear, we clear brush, demo any old slabs or decks in the way, and cut the pad. On steep lots this often means cutting into the hill on one side and building up on the other, which is where a lot of ADU budgets move. You’ll confirm where the spoils go – off-site hauling costs real money on a narrow hillside street.

Stage 4: Utility trenching and rough-in (days 8 – 20)

Water, sewer, gas, and electrical conduit all go in before the slab or foundation. Sewer is the one that surprises people: if the main line is uphill from the pad, you’re looking at a lift pump, and that’s a decision you’ll want to make early. We set electrical conduit with enough capacity for future panel upgrades and run the gas line with a shutoff accessible from outside the unit.

Stage 5: Foundation, drainage, and inspection (days 15 – 35)

Footings, slab or stem-wall, and perimeter drainage all go in, then the county inspects before anything gets buried. We don’t backfill until the inspection is signed off. Final grading and stabilization close out the phase, and you’re ready for framing.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Site and System Choices You’ll Actually Make

Most of the cost swings come down to a handful of early decisions. Here’s the honest trade-off on each.

  • Slab-on-grade vs. raised foundation. A slab is cheaper and simpler on a flat pad. A raised foundation handles slope better and gives you access for plumbing repairs, but adds 15% – 25% to the foundation line.
  • Sewer by gravity vs. lift pump. Gravity is cheaper and maintenance-free. A lift pump solves uphill tie-ins but means a mechanical component that needs power and occasional service.
  • Drainage: French drain vs. surface swale. A French drain moves water underground and out of sight. A surface swale is cheaper but takes up yard space and needs grading to work. On a post-fire-watershed lot, both need to route water away from the slope, not into it.
  • Electrical service: separate meter vs. subpanel. A subpanel from the main house is faster and cheaper. A separate meter is cleaner for a rental and worth considering if you plan to rent the unit long-term.
  • Gas and water line material. Standard PEX and copper for water, CSST or black iron for gas. Black iron is more durable and code-preferred for exposed runs; CSST is faster to install.

What ADU Site Prep & Utilities Costs in La Crescenta-Montrose, CA

A framer checking new wall framing on a home addition

Expect $45,000 – $130,000 for the site prep and utility phase. The low end is a flat-ish lot with gravity sewer and short runs to existing utilities. The high end is a steep hillside build with a slope-stability review, a retaining wall, a lift pump, and 40 feet of trenching through rocky soil.

  • Excavation and grading: $12,000 – $38,000, driven by slope and how much cut-and-fill the lot needs
  • Foundation: $10,000 – $30,000, slab vs. raised, plus footing depth
  • Utility trenching and rough-in: $8,000 – $28,000, mostly distance and depth to existing lines
  • Drainage and slope stabilization: $5,000 – $18,000, higher if a retaining wall is required
  • Permits and engineering: $4,000 – $16,000, higher on hillside grading and fire-zone reviews

A written estimate should list each line, the quantities, and what’s excluded. What’s typically excluded: the ADU structure itself, landscape restoration beyond regrading, and any surprises found during excavation (that undocumented retaining wall, for example). We won’t change the price to absorb a surprise without showing you what we found and what it costs to fix.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What La Crescenta-Montrose Homes Specifically Do to This Job

The terrain here is the whole story. La Crescenta-Montrose sits in the Verdugo foothills with steep, narrow lots and a patchwork of unincorporated county pockets, so site prep for an ADU means navigating LA County building codes, hillside grading rules, and fire-resistant requirements that simply don’t come up on a flat, incorporated lot. The housing stock is mostly mid-century single-family homes on sloped lots with crawlspaces, post-and-beam additions, and wiring that runs from knob-and-tube to early Romex, so a site walk often turns up non-permitted work and structural upgrades to get the pad stable. Then there’s the dry, brush-covered hillside above you, which is a high fire severity zone and a drainage problem after heavy rain. Many of these lots have rear yards that drop off sharply, so the slope can hide an unpermitted deck or a wall nobody documented, and that discovery alone can add weeks. This is the work our Home Additions & ADU in La Crescenta-Montrose covers in full, and we handle it from Home Additions & ADU start to finish. We work across La Crescenta-Montrose and nearby, and when the driveway into the dig needs rebuilding, homeowners often pair this with Concrete Driveways & Concrete Work in La Crescenta-Montrose or Paver Driveways in La Crescenta-Montrose since equipment access and a finished approach go together.

Serving La Crescenta-Montrose, CA – Our Local Coverage Area

We serve La Crescenta-Montrose and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: ADU Site Prep & Utilities in La Crescenta-Montrose

New painted shaker cabinets with an organized deep drawer

Get a Real Number on Your La Crescenta-Montrose Lot

Free on-site estimate for ADU site prep and utilities in La Crescenta-Montrose. Call (844) 797-7958 and a live person answers, day or night. You’ll describe the lot, we’ll schedule a walk, and you’ll get a written line-item quote that covers excavation, foundation, utilities, and drainage, with no surprises once the work starts. That’s upfront pricing, done the way it should be.

Written by the team at Groundwork Construction Co.

Why La Crescenta-Montrose Chooses Groundwork Construction Co. of Burbank

We set the standard for ADU site prep & utilities in La Crescenta-Montrose.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in La Crescenta-Montrose

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What La Crescenta-Montrose Customers Say

Trusted by homeowners across La Crescenta-Montrose and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"Quality work and honest pricing. He is stretched across a few jobs at once so he is not always on site, though the carpenter who was there knew everything."

Whitney Norris

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodelA new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fence

More services in La Crescenta-Montrose

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Burbank

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Burbank team

A local vetted partner works across Burbank and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in La Crescenta-Montrose?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in La Crescenta-Montrose.

(844) 797-7958

Request a Free Estimate in La Crescenta-Montrose

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch