A Groundwork company - serving Burbank, CA
A new rear addition with a vaulted beamed ceiling and tall windows

ADU Site Prep & Utilities in Burbank, CA

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Burbank
A garage converted into a guest room and home office
A finished backyard cottage with a small covered porch
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

ADU Site Prep & Utilities in Burbank, CA

ADU site prep and utilities in Burbank means getting the ground and the services ready before a single wall goes up: grading and excavation, trenching for sewer and water, running electrical and gas, and pouring the foundation or slab the unit will sit on. It’s the part of an accessory dwelling unit project that nobody photographs and everybody depends on, and it’s where most Burbank ADU builds either get smooth or go sideways. Groundwork Construction Co. of Burbank handles it as one coordinated phase of your Home Additions & ADU project, so the trades don’t show up weeks apart and leave a muddy hole sitting in your backyard. Call (844) 797-7958 and we’ll walk the lot with you.

Burbank is a city of tight lots. Most of the parcels here were platted in the 1920s through the 1950s, back when nobody imagined a second dwelling behind the main house. That means the existing sewer lateral may be clay or cast iron running under a mature ficus, the electrical panel may be a 100-amp Zinsco that’s already maxed out, and the only access to the back of the property might be a 4-foot side yard next to the neighbor’s block wall. We plan around those realities before we break ground, not after we hit them.

What “site prep and utilities” actually covers

  • Survey and layout – staking the unit footprint against setbacks, which in Burbank means 4 feet from the side and rear property lines for a detached ADU in most R-1 zones, plus fire separation from the main house.
  • Demolition and clearing – removing the old garage slab, the dying lawn, the shed nobody’s opened since 2009, or a pool that has to go before anything gets built.
  • Grading and drainage – cutting and filling to get a level pad, and setting the finished floor elevation so water sheds away from both the ADU and the main house. Burbank’s clay-heavy soil and the hillside lots north of Glenoaks make this more than a formality.
  • Trenching and underground utilities – sewer, water, gas, and electrical conduit, run at the right depth and inspected before backfill.
  • Foundation or slab – forming, rebar, pouring, and curing, with anchor bolts and hold-downs placed for the specific unit design.

If you’re still deciding whether an ADU pencils out at all, our guide to ADU costs in Burbank covers the full budget picture. This page is about the ground-up front end of that project.

Key takeaways

  • Site prep and utilities typically run $18,000 to $45,000 of an ADU budget in Burbank, and it’s the line item most likely to surprise homeowners.
  • Burbank’s older lots often need a sewer lateral replacement or an electrical service upgrade, and those add real money.
  • Every trench gets inspected before it’s covered, and every project is backed by our 730-Day Done Right Promise.
  • Most site prep phases run 3 to 6 weeks on a standard Burbank lot, weather and inspection scheduling permitting.
A remodeled family room with new windows and a window seat

When You Need ADU Site Prep & Utilities

Some homeowners come to us with plans already stamped. Others have a permit in progress and a backyard that’s never held anything heavier than a patio table. Either way, here are the situations where this phase is the whole ballgame.

  • You’re converting or replacing an old detached garage. Half the detached garages in Burbank weren’t built to code – shallow footings, single-circuit wiring, no permit on record. Knocking one down and pouring a proper foundation for a 500-square-foot unit is site prep from scratch, and the old slab usually can’t be reused.
  • Your main panel can’t carry a second dwelling. A 100-amp panel serving an all-electric house with a pool pump and a EV charger in the driveway has nothing left. We assess the load and coordinate the service upgrade with Burbank Water & Power before the electrician needs it.
  • The sewer lateral is original and under a tree. Cast iron and clay laterals from the 1940s are common in the Magnolia Park and Rancho Equestrian areas. A camera inspection tells us whether we’re tying in or replacing, and that decision changes the budget by several thousand dollars.
  • The lot slopes. Hillside properties in the Burbank foothills above Kenneth Road often need retaining walls, stepped foundations, or significant cut-and-fill to create a usable pad. Flat lots in the Rancho district don’t, and the price difference is dramatic.
  • Drainage already pools near the main house. If the back corner of your yard floods every February, adding a building there without addressing grade and drainage is asking for a foundation problem and a call back to whoever built it. We fix the water first.
  • You’re planning an ADU in a tight, zero-lot-line property. In areas like the neighborhoods around downtown Burbank, access to the rear of the lot can be the hardest part of the job. Excavators don’t fit through a 3-foot gap, so staging and access planning happen early.

Our ADU Site Prep & Utilities Process

We run this as a sequence with inspections built in at each gate, because a covered trench that fails inspection is a very expensive mistake. Here’s how it goes.

  1. Site walk and feasibility review. We visit the property, pull the parcel history, check what’s already permitted, and look at where utilities enter and leave. We measure the actual lot, confirm setbacks against Burbank’s ADU ordinance, and identify the access route for equipment. If we find a problem – a shared sewer line, an unpermitted addition on the main house, a slope that won’t hold – we tell you now, not three weeks into digging.
  2. Plans, permits, and utility coordination. We work with your architect or bring in the design side, then submit to Burbank’s Community Development Department and coordinate water and power service with Burbank Water & Power. Our team has up to 12 years of experience pulling permits in this city, which means we know what the plan checker is going to ask about before they ask.
  3. Demolition and grading. The old garage, slab, trees, or pool comes out. We strip the site, cut and fill to the plan elevation, compact in lifts, and set the pad. On a lot with neighbors on three sides, we also protect what stays: trenches don’t cross property lines, and we don’t drive equipment across a neighbor’s driveway without an agreement in writing.
  4. Underground utilities. Sewer, water, gas, and electrical conduit get trenched, laid, and pressure-tested where applicable. We schedule the inspections before backfill. If your panel needs an upgrade or the lateral needs replacement, it happens here, and we walk you through the actual scope before we do it. This is where our electrical panel upgrade work in Burbank usually ties in.
  5. Foundation pour. Forming, rebar, anchor bolts, inspection, and pour. Concrete needs to cure properly, and we don’t rush it to look fast. The foundation is the one thing you can never fix later without tearing the building down.
  6. Handoff to the build. Once the pad is set and utilities are stubbed in, framing follows with no surprises waiting underground. We hand off to the next phase and stay on the project through completion.

From foundation to finish line, one contractor owns the whole sequence, which is one of the reasons we built our service around the full ADU and addition scope rather than handing you off between subs.

A framer checking new wall framing on a home addition

ADU Site Prep & Utilities Pricing in Burbank

Honest ranges, based on what we see on real Burbank lots. Every property is different, so these are bands, not quotes. Upfront pricing is the standard here: the number you see is the number you pay.

Line item Typical range What drives the price
Site survey and layout $800 – $2,500 Lot size, slope, need for a civil survey
Demolition and clearing $2,500 – $9,000 Old garage, slab, trees, pool removal
Grading and drainage $3,000 – $12,000 Slope, soil conditions, retaining walls, French drains
Sewer lateral tie-in or replacement $2,000 – $8,500 Depth, distance to main, condition of existing lateral
Water line $1,200 – $3,500 Distance to meter, need for a new meter
Electrical trench, conduit, service upgrade $2,500 – $9,000 Panel capacity, distance, whether an upgrade is required
Gas line $900 – $3,000 Distance, depth, whether gas is even needed
Foundation or slab $6,000 – $18,000 Square footage, flatwork vs. stem wall, soil and engineering
Typical total $18,000 – $45,000 Combination of the above, plus permit fees

What moves the number

  • Distance from the meter and the main. A unit 90 feet from the street costs more to connect than one 30 feet away. That’s just pipe and trench time.
  • Age and condition of what’s already there. A house built in 1948 with original systems needs more work than a 2015 build. This is the single biggest swing factor we see in Burbank.
  • Slope and soil. Flat lots in the Magnolia Park flats are straightforward. Hillside lots above Glenoaks need engineered foundations and retaining, and the price reflects it.
  • Whether you need a service upgrade. If the existing panel has capacity and the meter has room, this line goes away entirely. If not, it doesn’t.

On financing: we offer 0% financing for 18 months, and $1,000 off projects over $10,000. Between the two, a site prep phase that looks intimidating on paper becomes a monthly number you can plan around. Every estimate and design consult is free, so there’s no risk in getting the real number before you decide anything.

Want to see how the front-end costs roll into the full project? Our page on choosing an ADU builder in Burbank breaks down what to compare across bids.

Why homeowners in Burbank pick us for this phase

Site prep is the least glamorous part of an ADU project and the one most contractors subcontract out without much oversight. We don’t. The same crew that plans your utilities is on site when the trenches are inspected and when the foundation is poured. Our technicians are background-checked and show up in uniform, with up to 12 years of experience on the team and the same faces from the first walk-through to the final pour.

Materials matter here too, even underground. We spec utilities and foundation components to last, not to pass inspection and nothing more. When the above-ground build uses James Hardie siding and an interior built around KraftMaid cabinetry, the foundation and service connections underneath have to hold up for decades alongside them. Built to last, backed in writing: every project is covered by our 730-Day Done Right Promise. If something we installed isn’t right, we make it right, and that includes underground work.

Calls are answered by a live person 24/7. If a trench floods on a Saturday night or you have a question about an inspection, you reach a human, not voicemail. That’s a commitment we don’t take lightly, and it’s one of the things homeowners tell us mattered most.

Working with Burbank’s codes and utilities

A few local details worth knowing before you start. Burbank’s ADU ordinance allows detached units on qualifying lots, but setback, height, and lot coverage rules apply and vary by zone. New construction requires a soils report in many cases, and hillside grading may trigger additional review. Burbank Water & Power handles both water and electric service in this city, which is not the case in most surrounding cities, and that single point of coordination simplifies scheduling if you know how to work with it. We do. Building departments in adjacent cities like Glendale and Pasadena work differently, and a contractor who runs projects across the region learns those differences fast.

We also know which neighborhoods present which challenges. The 1920s bungalows south of Alameda often have shallow service laterals and small panels. The postwar tracts in the Sun Valley-adjacent parts of Burbank have tighter side yards. The equestrian properties near the Rancho district sometimes have older outbuildings and wells that need to be assessed before anything new goes in. None of this is a reason not to build. It’s a reason to plan properly, and that’s the work we do.

FAQs – ADU Site Prep & Utilities

How much does ADU site prep cost in Burbank?

Site prep and utilities for an ADU in Burbank typically run $18,000 to $45,000, depending on how much existing infrastructure needs replacing, the distance to the meter and main, and whether the lot is flat or sloped. The biggest variable is the age and condition of the existing sewer lateral and electrical service. Call (844) 797-7958 for a free estimate on your specific lot – the consult costs nothing and the number is upfront.

Do I need to upgrade my electrical panel before building an ADU?

Often yes. A 100-amp panel serving an all-electric main house with a pool pump or EV charger usually doesn’t have the capacity for a second dwelling, and many Burbank homes built before 1970 are already at that limit. We assess the load during the site walk and tell you whether an upgrade is required or whether your existing service can carry the unit. If it’s needed, the work happens during site prep, not after framing. Call (844) 797-7958 to schedule a review.

Can a detached ADU connect to my existing sewer and water lines?

Yes, in most cases, and it’s usually cheaper than running new service to the street. The existing lateral is camera-inspected first, because tying a new 500-square-foot unit into a cracked 1940s clay line is a problem waiting to happen. If the lateral is sound, we tie in. If not, we replace it during site prep while the ground is already open, which is far less expensive than doing it later. Call (844) 797-7958 and we’ll walk your line and give you a straight answer.

How long does site prep take before the ADU build starts?

Most ADU site prep phases in Burbank run 3 to 6 weeks from demolition through foundation pour, depending on permit timelines, inspection scheduling, and whether a service upgrade or sewer replacement is needed. Weather adds time in winter, and Burbank’s clay soil doesn’t drain fast. We give you a realistic schedule in the estimate and update you as we go. Call (844) 797-7958 to talk through your timeline.

Do you handle the permits and utility coordination?

Yes. We work with your architect or bring in design support, submit to Burbank’s Community Development Department, and coordinate water and electric service with Burbank Water & Power. You don’t chase signatures or wait on hold. Call (844) 797-7958 and we’ll tell you exactly what your project needs.

Ready to plan your ADU’s groundwork?

If you’re planning an ADU in Burbank, the smartest money you’ll spend is on getting the ground and utilities right the first time. Whether you’re at the “just thinking about it” stage or you have stamped plans and a contractor who hasn’t called you back, we’re worth a call. Reach out for a free project estimate and design consult. We’ll walk the lot, look at the panel, inspect the lateral, and give you a real number, upfront and in writing. Call Groundwork Construction Co. of Burbank at (844) 797-7958 – a live person answers, day or night. Your project deserves a team that shows up from foundation to finish line, and that’s what we do.

Written by the team at Groundwork Construction Co. of Burbank, serving Burbank.

Getting started with Groundwork in Burbank

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Burbank team

A local vetted partner works across Burbank and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Burbank? Licensed & insured · free written estimates
Call (844) 797-7958
Local Service Coverage

Request a Free Estimate in Burbank

Tell us what you need - Groundwork Construction Co. of Burbank responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch