A Groundwork company - serving Burbank, CA
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Glendale, CA

New Detached ADU in Glendale - One Fixed Price, Permits Handled

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Burbank
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Glendale, CA: What It Costs and How Long It Takes

A new detached ADU in Glendale typically runs $90,000 – $220,000 for a full, permitted, move-in-ready unit, with most of our Glendale projects landing in the $45,000 – $130,000 range for the structure itself before site work. Plan on 7 – 11 months from the first site visit to a signed-off final inspection, and longer if your lot sits on a slope in the Verdugo foothills. Call (844) 797-7958 and we’ll walk your lot, check the setbacks, and give you a written number.

Call (844) 797-7958

How We Build a New Detached ADU, Stage by Stage

A garage converted into a guest room and home office

Detached means a separate structure with its own foundation, its own utilities, and its own inspection sequence. That’s the whole reason the job takes longer than a garage conversion. Here’s the real order of operations, and what you’ll be deciding at each turn.

Stage 1: Feasibility and site walk (weeks 1 – 3)

We start on your lot, not at a desk. Setbacks, height limits, and how the grading will work on a hillside parcel all get checked before anyone draws a plan. You’ll decide unit size and whether it’s a studio-plus or a true one-bedroom, because that choice drives the whole layout downstream. If the lot is sloped, this is where a geotechnical report enters the picture, and we tell you that up front rather than six weeks in.

Stage 2: Design and permitting (months 1 – 4, overlapping)

Plans get drawn, then submitted for plan check. In Glendale this is where stubborn timelines live: hillside parcels, seismic review, and grading all add rounds of comments. You’ll pick your exterior material direction here (stucco and trim versus fiber cement siding), your window package, and your roof type, because those all go on the drawings. Approvals move faster when the specs are locked before submittal, not changed after.

Stage 3: Site prep, foundation, and utilities (months 3 – 5)

Demo of anything existing, grading, trenching for water, sewer, gas, and electrical, then the foundation pour. If your lot drains toward the house or the street, this is when drainage and retaining get resolved. You’ll decide utility routing with us (separate meter versus tied to the main) and confirm the finish floor elevation. Inspections happen here at the trench and foundation stages.

Stage 4: Framing, rough-in, and enclosure (months 5 – 8)

Walls, roof, windows, then the rough electrical, plumbing, and HVAC behind them. This is the longest stretch, and it’s also when the shell gets weather-tight. You’ll pick the interior layout details, the flooring, and the kitchen and bath fixture rough-ins so the crew isn’t waiting on you. Framing, rough-in, and insulation each get their own inspection before drywall goes up.

Stage 5: Finishes, final inspection, and handover (months 8 – 11)

Drywall, cabinets, counters, tile, paint, trim, and the final inspection. You’ll make your finish selections during Stage 4, not during Stage 5. On the last day we walk the unit with you, test the systems, and hand over the warranty in writing. Most Glendale detached ADU projects land in this 7 – 11 month window when the lot is flat and the plans are clean.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between for a Detached ADU

Every detached unit forces a set of trade-offs, and the ones you pick move the price more than anything else. These are the decisions that actually come up.

  • Unit size and configuration: A studio-plus (400 – 500 sq ft) costs less and builds faster, but a true one-bedroom (600 – 750 sq ft) rents for more and suits family. The extra bedroom is the single biggest swing in the budget.
  • Exterior cladding: Stucco is the classic Glendale match to the 1920s – 40s Spanish Colonial stock nearby and costs less. Fiber cement siding (James Hardie) costs more but handles foot-hill weather and fire exposure better and holds paint longer.
  • Windows and doors: Standard vinyl is the budget path. Better glazing and impact-rated units from ES Windows or ECO Window Systems cost more up front, but on a foothill lot with Santa Ana wind events that trade-off pays back in comfort and ember resistance.
  • Roof: Asphalt shingle (GAF, CertainTeed) is the value option. Class A fire-rated assemblies cost more but are the responsible choice in wildfire-adjacent neighborhoods.
  • Utilities: A separate meter means a separate bill and cleaner long-term rental math; tying to the main is cheaper to install. You’ll decide this in Stage 3.
  • Finishes: A durable rental-grade finish (vinyl plank, quartz-look counters) versus a higher-end owner-occupant finish. This is where you decide whether the ADU is a rental asset or a family residence.

What a New Detached ADU Costs in Glendale, CA

A framer checking new wall framing on a home addition

The honest range for a detached ADU in Glendale is $90,000 – $220,000 for a fully permitted, finished unit. Small, simple units on flat lots land near the bottom; larger one-bedrooms on sloped lots with fire-rated assemblies and premium glazing land at the top. If this is part of a wider project, the broader numbers live on our Home Additions & ADU in Glendale page. Here’s how the money breaks down across the variables that actually move it:

  • Size: Going from a studio to a full one-bedroom typically adds $25,000 – $45,000.
  • Site condition and grading: A flat lot is the baseline. Steep lots in Chevy Chase Canyon or off Glenoaks can add $15,000 – $40,000 in grading, retaining, and geotechnical work.
  • Utility routing: A separate meter and longer trench runs add cost; tying to the main is cheaper.
  • Material grade: Fire-rated roofing, impact glazing, and premium cladding can add $10,000 – $30,000 over builder-grade.
  • Permit and plan-check scope: Hillside and seismic review adds weeks and fees; a simple flat-lot submittal moves faster.

A written estimate from us line-items the foundation, framing, utilities, finishes, permits, and inspections, so the number you sign is the number you pay. What typically sits outside a standard estimate: major unforeseen grading beyond the geotech report, and any owner-requested changes after plans are approved.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Glendale Homes Specifically Do to This Job

Glendale is not a flat-lot suburb, and that shapes every detached ADU here. The city’s construction market runs on hillside infill and seismic work, and new foundations on steep parcels in the Verdugo foothills and Chevy Chase Canyon have to clear some of the strictest seismic and hillside grading codes in the state. That’s the single biggest reason a detached ADU in Glendale costs more than the same unit two cities over. Homes near downtown, in the 91205 and 91204 ZIPs, tend to be 1920s – 40s Spanish Colonial and Craftsman bungalows where the lot is tight and setbacks get interesting. In the 91208 hillside ZIPs you’re dealing with slope-stability review, and a simple structure can trigger a geotechnical report that adds months. Then there’s fire: hot, dry summers and Santa Ana wind events push demand for fire-resistant roofing and ember-resistant vents, so we spec Class A assemblies and defensible-space detailing as standard. If your ADU shares a lot that also needs a new driveway or approach, homeowners often pair this with Concrete Driveways & Concrete Work in Glendale or Paver Driveways in Glendale so the site work happens in one pass.

Serving Glendale, CA – Our Local Coverage Area

We serve Glendale and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Glendale

New double-hung windows in a dining room

Get a Free Estimate on Your Glendale Detached ADU

A detached ADU is a big commitment, and the right first step is a free on-site estimate, not a sales pitch. Call (844) 797-7958 and a live person answers around the clock. We’ll walk your lot, check setbacks and slope, and put the budget in writing. Our technicians have up to 12 years of experience, and it’s all covered by our 730-Day Done Right Promise. Whether you’re in the foothills or near downtown Glendale, start with the number. See our full Home Additions & ADU service for related work.

Written by the team at Groundwork Construction Co.

Why Glendale Chooses Groundwork Construction Co. of Burbank

We set the standard for new detached ADU in Glendale.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Glendale

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Glendale Customers Say

Trusted by homeowners across Glendale and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"Quality work and honest pricing. He is stretched across a few jobs at once so he is not always on site, though the carpenter who was there knew everything."

Whitney Norris

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityA wood double vanity with two mirrors after a bathroom remodel

More services in Glendale

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Burbank

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Burbank team

A local vetted partner works across Burbank and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Glendale?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Glendale.

(844) 797-7958

Request a Free Estimate in Glendale

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch