A garage conversion ADU in Glendale typically runs $45,000 – $130,000 and takes four to seven months from first permit submittal to final inspection. The work turns an existing attached or detached garage into a legal, rentable living unit: new slab or raised floor over the old slab, framed walls, insulation, a full bathroom, a kitchenette, separate electrical, and its own entry. Call (844) 797-7958 to set up a free on-site estimate.
How a Garage Conversion ADU Comes Together, Stage by Stage

Garage conversions look simple on paper. They aren’t, mostly because everything that was never meant to hold a person (the slab, the wiring, the ventilation) has to be brought up to living-space standards. Here’s the real sequence.
Stage 1: Feasibility and field measurements (week one)
Before anyone swings a hammer, we measure the garage, check the existing slab thickness and slope, confirm ceiling height clears 7 feet, and look at where the electrical panel and water main sit. In Glendale this is also where the seismic question gets answered. You decide the layout here: studio versus one-bedroom, where the bathroom goes, how the entry is separated from the main house.
Stage 2: Design, engineering, and permits (weeks 2 – 10)
This is the longest stretch, and it’s the one that sinks budget-minded projects that skip it. A garage conversion ADU needs architectural drawings, a structural review if walls or the slab change, and a check on whether your lot already carries the allowable unit count. Glendale’s hillside and seismic codes make the plan check slower than in flatter inland cities. Most homeowners spend four to eight weeks waiting on approval before work starts.
Stage 3: Demolition and rough-in (weeks 10 – 16)
The old garage door comes out and gets infilled. We break or cap the slab as designed, run new plumbing for the kitchenette and bath, pull dedicated electrical circuits, and frame interior walls with fire-rated separation where the unit touches the house. Rough inspections for framing, electrical, plumbing, and mechanical happen at the end of this stage. Expect heavy machinery and disposal in the first few days.
Stage 4: Insulation, drywall, and finishes (weeks 16 – 24)
Title 24 insulation, then drywall, then the surfaces you actually live with: flooring, cabinetry, tile, paint, fixtures. This is where the choices you made in Stage 1 turn into a real number, and where owners most often add a line item they forgot, like a mini-split or a stackable washer-dryer hookup.
Stage 5: Final inspections and certificate of occupancy (weeks 24 – 30)
The building inspector signs off, the unit gets its own address or sub-meter where required, and you get the certificate of occupancy that makes it legal to rent. Skipping this step is the single biggest reason converted garages become liabilities at resale. It’s also the moment our 730-Day Done Right Promise starts running: if something isn’t right, we come back and fix it.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Decisions You’ll Actually Make
Most of the final cost lives in four choices. Here’s the honest trade-off on each.
- Slab-on-grade vs. raised floor. Pouring a new slab is the cheaper path and gives a flat, level floor, but it means breaking up the old one and delays the schedule by a week or two. A raised wood-framed floor over the existing slab is faster and keeps the old garage floor intact, but it costs more per square foot and eats a few inches of ceiling height.
- Kitchenette scope. A sink, mini-fridge, and microwave run at the low end. Adding a full cabinet run, a cooktop, and a proper vent is what pushes you toward KraftMaid or Wellborn cabinetry pricing and a longer rough-in. It’s worth it if you plan to rent long-term; it’s overspend if this is for a family member.
- Climate control. A ductless mini-split handles Glendale’s hot summers and mild winters well and lets each zone be set independently. A through-wall unit is cheaper upfront but noisier and less efficient.
- Exterior skin. Matching the existing house’s stucco and trim matters more than it sounds, especially on a street of 1920s – 40s Spanish Colonial or Craftsman bungalows. James Hardie siding is a common pick where stucco repair is extensive, since it holds up with less maintenance.
- Wet-bar vs. full kitchen vs. none. The simplest legal ADU still needs a bathroom. Whether it also gets a kitchenette is the swing decision, and it directly affects what the unit can rent for.
What a Garage Conversion ADU Costs in Glendale, CA

For Glendale, expect a garage conversion ADU to land between $45,000 and $130,000, with most single-car and two-car conversions we evaluate falling in the $55,000 – $95,000 band. That range is real and it’s wide because of five variables:
- Garage size and layout. A single-car garage often needs an exterior bump-out to fit a legal bathroom and livable space; that bump-out adds cost fast.
- Condition of the existing structure. Cracked slabs, rotted framing, or an undersized electrical panel all get discovered during rough-in, and all push the number up.
- Moving plumbing and electrical. If the water main and panel are already on the garage side, you save significantly. If they aren’t, trenching and a panel upgrade add real dollars.
- Material grade. Builder-grade finishes sit at the low end. Custom cabinetry, tile work, and higher-end lighting push toward the top.
- Permit and engineering scope. A project that triggers structural review or hillside grading review costs more and takes longer than a straight conversion.
A written estimate from us itemizes each of those lines so you can see what’s driving your number. It also states upfront that the quoted price is the price: no change orders hiding in the fine print. What’s typically not included in a base estimate: landscape repair, appliance packages beyond what you specify, and any foundation work a geotechnical report turns up.
See the difference
Before
After
Before
After
Before
AfterWhat Glendale Homes Specifically Do to This Job
Glendale’s housing stock splits into two problems for a garage conversion. Near downtown, the 1920s – 40s Spanish Colonial and Craftsman bungalows often have detached garages that sit on old, shallow slabs and were framed for a car, not a person. On the hillside streets off Glenoaks and up in Chevy Chase Canyon, the same conversion can trigger a geotechnical report and slope-stability review because the lot itself is steep. That review adds months and real cost, and it’s the single local factor most likely to surprise a homeowner. The mid-century ranch homes across the 91209 and 91210 ZIPs are usually the cleanest candidates: flat lots, generous garages, and utility runs close by. On the wildfire side, Glendale’s dry summers and Santa Ana wind events mean we spec ember-resistant vents and fire-rated assemblies on conversions near the foothills.
Serving Glendale, CA – Our Local Coverage Area
We serve Glendale and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions: Garage Conversion ADU in Glendale

Plan on four to seven months total, with the permit and plan-check phase alone running four to eight weeks. Actual construction is usually 12 – 18 weeks; the rest is waiting on approvals and inspections.
Yes, always. A legal conversion requires building, electrical, plumbing, and mechanical permits plus a certificate of occupancy. We pull the permits and see the inspections through, because an unpermitted conversion is a liability at sale and can be ordered torn out.
Sometimes, but not usually. The bathroom almost always needs a new drain line, and many garages need a slab or floor change. The cheapest conversions happen where the water main and electrical panel are close and the slab is sound.
Between $45,000 and $130,000, with most projects landing closer to $55,000 – $95,000. Size, existing condition, plumbing and electrical location, finish grade, and permit scope are the movers. Call (844) 797-7958 for an exact quote; estimates are free.
Yes, every garage conversion ADU we build is covered by our 730-Day Done Right Promise. If something isn’t right, we make it right, and the guarantee starts at final inspection.
If your plan for the garage is part of a larger project, it’s worth reading our Home Additions & ADU in Glendale page for how the pieces fit together. Many homeowners also pair the conversion with new access or parking work, like Concrete Driveways & Concrete Work in Glendale or Asphalt Driveways & Resurfacing in Glendale, since the old driveway often has to be reworked once the garage function changes. And if you’re still mapping out the whole plan, our Home Additions & ADU service covers the broader range, and you can see everything we handle across Glendale.
Get a Free Estimate for Your Garage Conversion ADU in Glendale
Call (844) 797-7958 to schedule a free on-site estimate for your garage conversion ADU in Glendale. On the call we’ll confirm your garage dimensions, talk through layout and budget, and set a time to walk the space. A live person answers around the clock, and you’ll leave with a written, itemized quote rather than a ballpark. No pressure, no surprises.