ADU Design & Permitting in Burbank: What It Takes and What It Costs
ADU design and permitting in Burbank runs $45,000 – $130,000 for the design-through-permit scope on a typical conversion or attached unit, and the design-and-approval phase alone usually takes 4 to 7 months before a shovel hits dirt. The number swings on whether you’re working inside an existing footprint or adding structure, and on how much the city’s plan check asks you to correct. Call (844) 797-7958 to start with a free on-site estimate.
How we run design and permitting, stage by stage

Permitting is where most Burbank ADU projects stall, so we front-load the work that keeps plan check from kicking the file back three times. Here’s the actual sequence.
Stage 1: Site walk and feasibility (week 1)
We measure the lot, check setbacks against the zoning for your block, and confirm what’s already on the property. In Burbank this matters more than most places, because Magnolia Park bungalows and Rancho Equestrian properties frequently carry unpermitted additions or converted garages that surface the moment you pull a record. You decide at this stage whether to convert existing space or build new, and we tell you honestly which one the lot and the records will support.
Stage 2: Schematic design and your decisions (weeks 2 – 5)
You get floor plans, elevations, and a site plan. This is where you choose unit size, bedroom count, kitchen and bath layout, and whether the unit is attached, detached, or a garage conversion. Each choice carries a cost consequence we price out in writing, not a vague “we’ll see.” Expect to make roughly a dozen real decisions here, and expect us to push you toward the ones that survive plan check.
Stage 3: Engineering and plan set assembly (weeks 5 – 9)
Structural, Title 24 energy compliance, and grading or drainage calcs where the lot slopes get folded into a complete submittal package. Burbank’s hillside streets above the valley floor trigger tighter grading review, so if your lot sits on the Verdugo edge, we build that scrutiny into the drawings rather than discovering it after submittal.
Stage 4: Submittal and plan check (weeks 9 – 20)
We submit to the city and respond to correction comments. A clean first review is the goal; a second round is common on older lots. You don’t have to do anything here except approve any design change a reviewer requests. This is the single longest stretch, and the one where a contractor who knows the local counter saves you the most calendar time.
Stage 5: Permit issuance and construction handoff (weeks 20 – 28)
Once the permit is issued, you either move to construction with us or take the stamped set to your builder. The design and permitting work is the foundation, and it’s part of a full Home Additions & ADU in Burbank scope when the project grows beyond a single unit.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The design and spec choices that actually change your number
Permitting costs are driven by scope, but the choices below decide whether your project lands near the bottom or top of the range. We walk through each one with you before a line gets drawn.
- Conversion vs. new structure. A garage or interior conversion reuses existing walls and foundation, which lowers design and engineering cost. A new detached unit adds site work, utilities, and structural design, pushing you toward the top of the range.
- Kitchen and bath count. Two full baths and a full kitchen mean more plumbing, more Title 24, more plan-check pages. A studio with a kitchenette is simpler to permit and cheaper to build.
- Window and door package. Impact-rated and thermally efficient units matter in Burbank’s heat and wind. We specify from brands like ES Windows and Therma-Tru where the energy compliance math and the durability both pencil out.
- Structural approach. Whether you can span a room without a new beam, or need engineered steel, is often the difference between a routine submittal and a structural-heavy one.
- Site and drainage. Flat lots are straightforward. Sloped lots near the hillsides need grading and drainage design that anticipates both fire clearance and flash runoff.
- Finish grade. Cabinet and fixture grade is a construction cost, not a design cost, but we flag it early so the permit set matches the budget you actually have.
What ADU design and permitting costs in Burbank, CA

Design and permitting for an ADU in Burbank typically runs $45,000 – $130,000 for the full design-through-permit scope, and construction is priced separately. Here’s how the line items break down.
| Line item | Typical range |
|---|---|
| Feasibility, site survey, schematic design | $4,000 – $12,000 |
| Structural and Title 24 engineering | $3,500 – $9,000 |
| Full plan set and submittal package | $6,000 – $15,000 |
| City plan check and permit fees | $3,000 – $12,000 |
| Correction responses and re-submittals | $1,500 – $6,000 |
| Grading and drainage design (sloped lots) | $2,500 – $8,000 |
What pushes a project to the high end: a sloped or hillside lot, an older home with unpermitted work to resolve, structural changes, and a larger unit with full kitchen and two baths. What keeps it low: a straightforward garage conversion inside the existing footprint on a flat lot with clean records. Your written estimate itemizes design, engineering, plan check, and permit fees separately, and the number you see is the number you pay. What’s typically not included: construction labor and materials, city fees that change after submittal, and any design change you request mid-review. Call (844) 797-7958 for an exact quote on your property.
See the difference
Before
After
Before
After
Before
AfterWhat Burbank homes specifically do to this job
Burbank’s housing stock writes its own rulebook for ADU work. Magnolia Park’s 1920s – 40s Spanish Revival and Craftsman bungalows often still carry original knob-and-tube wiring and lath-and-plaster, and many hide unpermitted additions or converted garages that only surface when you pull a permit. The 1950s – 60s ranch tract homes in the hills and the post-war flats near downtown are more forgiving to convert, but the hillside streets above the valley floor bring the region’s tightest fire-clearance and grading scrutiny, so a sloped lot needs drainage and clearance baked into the drawings. The dry San Fernando Valley heat and Santa Ana wind events also mean we spec exterior materials that hold up: windows and doors from brands like ECO Window Systems and Andersen where wind and sun exposure are real. Burbank is a company town built on a soundstage economy, and many of our clients here work in entertainment and expect camera-ready, permit-ready results on a schedule that respects their production calendar. That’s why plan-check-ready drawings, not optimistic ones, are what we deliver. We cover the whole city, and you can see our full Burbank service area for context.
Serving Burbank, CA – Our Local Coverage Area
We serve Burbank and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – ADU design and permitting in Burbank

Expect 4 to 7 months from first site walk to permit issuance on a typical Burbank ADU, with plan check as the longest single stage at 8 to 12 weeks. Call (844) 797-7958 for a timeline specific to your lot.
Yes. Every ADU in Burbank requires a building permit and a full plan set, including conversions. Skipping the permit creates a record problem that resurfaces when you sell or refinance.
Often, yes. A garage or interior conversion that reuses existing plumbing locations and structural walls keeps engineering simpler and plan check faster. It depends on the existing layout, which we check on site.
No. We quote the design and permitting scope in writing up front, and the number you see is the number you pay. City fee changes and design changes you request are the only variables, and we flag those before they happen.
Our design and permitting work is backed by our 730-Day Done Right Promise: if it’s not done right, we make it right. The permit set and the construction handoff are covered under that guarantee. Call (844) 797-7958 to start your free estimate.
Homeowners often pair an ADU permit with exterior work like Paver Driveways in Burbank or a Chain Link Fence in Burbank, and both can be scoped into the same site plan. Our Home Additions & ADU service covers the wider build when the unit moves past design.
Get a free estimate for your Burbank ADU
Call (844) 797-7958 to schedule a free on-site estimate for ADU design and permitting in Burbank. We’ll walk the lot, check what the records and zoning allow, and give you a written, itemized quote for the design and permit scope. A live person answers around the clock, so you’re not waiting until Monday to get started. The estimate costs nothing, and the number you see is the number you pay.